8/9/2020 Luna Construction updates!
We had another great Luna construction weekend with progress being made on the poopdeck and steering system. We had to spend some time Saturday cleaning up and doing some repair work to the construction site from the recent storm and the following down pour the next day. As we see what other tall ship programs are up to, we noticed a common theme- Maintain systems and prevent rot! If you’re not working on either of these you’re ships care can get away from you really quickly!
We’ll begin with the steering system. Steve has been working on this project for a while including having to design the aluminum tiller arm featured in an earlier article and now fabricating extruded fiberglass pads for the hydraulic cylinders to ride on.
Onto the poop deck! Excuse the blue hue, but the tarp is keeping us shaded. To help remove water from the deck we have added three scuppers to each side. Scuppers are openings in the sides of the boat which allows the water to drain instead of pool and cause rot. As we build Luna we constantly look for these potential pooling areas and figure out how to eliminate them, preventing water from getting below or causing rot which is much more than a cosmetic repair.
So there you have it! This weekends progress. We’ll be back on board this week and have more to share so check in regularly, share our blog and progress on social media and visit our website at www.colonialseaport.org